← All products

HIGH PERFORMANCE / EPOXY COATING

SHIELD PRO2305

Strength for demanding work.

High-build epoxy protection for steel and concrete in plants and factories. Strength and chemical resistance for demanding industrial service.

Indoor focusTwo-component
SHIELD PRO 2305 product packagingMATCHED BASE + HARDENER
01

Built for demanding service

Strong protective film for industrial floors and structures.

02

Chemical resistance

An epoxy foundation for surfaces exposed to demanding working conditions.

03

Direct protection

Apply directly to properly prepared steel. For concrete we recommend a compatible epoxy primer to seal surface pores.

PLAN IN U.S. UNITS

How far does a kit go?

Concrete estimate · 30% application loss · 9.84 mils / 250 µm total dry film.

Estimated coverage / U.S. gal
≈ 97 sq ft
Estimated coverage / kit
≈ 410 sq ft
Kit volume used for this estimate
4.23 U.S. gal
16 L · Part A + Part B combined

Concrete: allow 30% or more depending on porosity. We recommend an epoxy primer to seal surface pores. Primer quantity is separate.

Calculate my project →
Coated exterior of a tank at Jeju Power Generation Headquarters
Jeju Power Generation Headquarters · Tank exteriorCoated by WESTSEA C&C · South Korea

BUILT FOR DEMANDING ENVIRONMENTS

Strength for
industrial service.

  • Factory & industrial floors
  • Plant steel & concrete structures
  • Equipment & facility maintenance

Epoxy can yellow in sunlight. For an exterior finish that retains its appearance use a compatible urethane such as 2306 over 2305.

SHIELD PRO 2305 and 2306 share the coating technology supplied in Korea under the COVECOVE M800 name.

See industrial projects & Korean recognition ↗
Painted cabinets and furniture in an interior renovationMarble surfaces and a bathtub in a tiled bathroom

MORE THAN FLOORS

Bring color
to interior surfaces.

Refinish indoor furniture and marble. Give bathtubs and tile a new color finish with SHIELD PRO 2305.

Smooth bathtubs & tile: epoxy primer first. Prepare the surface and apply a compatible epoxy primer before the color coating.

Explore interior finishes ↗

PRODUCT AT A GLANCE

The essentials.

Components
Part A + matching Part B
Mixing ratio
5 : 1 by weight
Standard kit
4.23 U.S. gal / 16 L · 24 kg · Part A + B combined
TDS coating system
2 coats · 9.84 mils / 250 µm total dry film
Application
Brush · Roller · Spray
Interior applications
Furniture · Marble · Bathtubs · Tile
Smooth tile & bathtubs
Compatible epoxy primer required

APPLICATION OVERVIEW

Prepare. Mix. Protect.

  1. Prepare & prime where required

    Prepare the substrate. Smooth bathtubs and tile require a compatible epoxy primer before coating. Properly prepared steel can be coated directly. For concrete we recommend an epoxy primer to seal surface pores.

  2. Mix

    Mix only with 2305 Part B at 5:1 by weight.

  3. Apply

    Build the specified film and observe the recoat and cure schedule.

Use the matching hardener. Never interchange the Part B components. Follow the product instructions for mixing and working time.

Concrete preparation. We recommend a compatible epoxy primer to seal surface pores. Allow at least 30% application loss and increase for rough or porous surfaces. Primer and repair materials are separate. See surface guidance →

TECHNICAL RESOURCES

Before you begin.

Product instructions and application guidance for your work.

Technical data sheet · EnglishSHIELD PRO 2305 · PDFTechnical data sheet · SpanishSHIELD PRO 2305 · PDF2305 + 2306 exterior floor guide · EnglishSHIELD PRO 2305 · PDF2305 + 2306 exterior floor guide · SpanishSHIELD PRO 2305 · PDFRequest safety data sheet (SDS)SHIELD PRO 2305 · Available on request

YOUR NEXT PROJECT

Let’s talk about your surface.

Get help with SHIELD PRO 2305 and your project requirements.

Talk to our team

PRODUCT FINDER

What would you like to protect?

Start with the result you need.

Not sure? Describe your project to our team ↗